The construction of the business-class residential complex Maxima Residence, which is being implemented by the development companies Bosphorus Development together with RIEL Real Estate Corporation, is progressing according to schedule.
Construction works are being carried out simultaneously in all sections of the complex as well as in the underground parking, in accordance with the approved project implementation schedule.
In the first section, active façade and interior works are underway. Currently, about 75% of the window structures have been installed, and the façade cladding with porcelain stoneware tiles is in progress. The installation of passenger elevators has been completed, and commissioning works are currently being carried out. At the same time, installation of engineering networks continues, including electrical wiring and fire safety systems. On the residential floors, floor screeds are being completed and the installation of heating radiators has begun.
In the second section, construction works are actively continuing in several areas. The installation of window structures is ongoing — approximately 50% of the area has already been installed and glazed. In parallel, installation of engineering networks is in progress.
Façade works have begun: installation of brackets and the façade substructure is underway, insulation is being mounted, and preparations are being made for the subsequent installation of porcelain stoneware façade cladding.
In addition, the installation of the freight elevator has been completed, and commissioning works are currently underway. The installation of passenger elevators has begun, while floor screeds are being carried out on the residential floors.
In the third section, the foundation for tower crane No. 3 has been completed, and its installation has begun. At the same time, earthworks within the section’s construction footprint are nearing completion, while the sheet pile enclosure has been completed 100%. This makes it possible to prepare the site for the next stage of construction works.