From Bosphorus Development and Riel Real Estate Corporation we report that the construction of the residential complex Maxima Residence continues.

In the first section, monolithic structures are being installed on the 26th floor, in parallel, the installation of ventilation blocks and reinforced concrete monolithic stairs is underway.

The masonry of external and internal walls is 60% complete.

The excavation for commercial premises in the area of ​​the first section is being developed.

In the second section, monolithic works are underway at the level of the 24th floor. The masonry of the external and internal walls is 50% complete, and work on the decorative elements of the arch behind the section has now been completed. In parallel, the installation of ventilation blocks and reinforced concrete monolithic stairs is underway, and the extension of the tower cranes to the maximum height has been fully completed.

Monolithic works have been completed on the parking lot.