From Bosphorus Development and Riel Real Estate Corporation we report that the construction of the residential complex Maxima Residence continues. According to the project manager, in the second section, the basement floor is covered, monolithic reinforced concrete stairs and ventilation units are being installed. Construction of the foundation slab for the tower crane is underway.

In the first section, the covering of the fourth floor has been completed, and the vertical of the fifth floor is in progress. Construction of reinforced concrete monolithic stairs and ventilation units is underway.

At the same time, a piled field is being built in the third section.

The monolith of the first capture ends in the parking lot.